Statutory approvals

Drawings, approvals and fire NOC, handled.

Building plans, structural designs, fire NOC, occupancy certificates, environmental clearance and licences. We prepare, file and follow up, so you don’t have to queue at every counter.

Why us

The paperwork is rarely the problem. Knowing the process is.

We know which submissions get rejected and why, what the verifying officer looks for first, and how to avoid a second site visit.

Architects, structural engineers, fire-safety and environmental specialists and legal advisers work as one team. You get one point of contact and one bill.

Pricing is fixed per approval, not a percentage of project cost, so we have no reason to inflate your project.

What we file

Every statutory document.

If your project needs a stamp, we can probably file it. If we can’t, we’ll tell you who can.

Building plan approval

Architectural drawings, sanctions, revisions and modifications with local bodies and development authorities.

Structural design

Stamped structural drawings, seismic compliance, soil reports and proof checks.

Fire NOC

Provisional and final fire NOC for hospitals, hotels, malls and multi-storey buildings, including system design.

Occupancy certificate

Commencement, occupancy and completion certificates, including site inspections.

Environmental clearance

EIA studies, consent to establish and operate, and pollution control board approvals.

Hospital licences

Clinical Establishment Act, biomedical waste, blood bank, radiation and PNDT registration.

Drug and pharmacy licences

Form 20 / 21, retail and wholesale, expansions, transfers and renewals.

Lift approvals

Inspectorate of Lifts approvals and periodic certification.

Electrical safety

CEIG approvals, HT / LT installations, captive power and DG sets.

Trade and municipal licences

Shops and establishments, trade licence, signage, water and sewerage.

How it runs

One thread, fully visible.

One tracker, regular status updates and a named owner for every filing.

  1. Step 1

    Map approvals

    We list every central, state and local approval your project needs.

  2. Step 2

    Prepare

    Drawings, calculations, undertakings and fee challans prepared in-house.

  3. Step 3

    File and track

    Submitted in the right format to the right office, with status you can see.

  4. Step 4

    Clear

    We accompany inspectors on site visits and respond to queries quickly.

Building stuck without approvals?

Send us the file. We will come back with a plan and a fixed fee.